Project Details

Market: Healthcare

Service Type: Specialty Equipment Installation, Plumbing, Electrical Panel Setup

Location: Temple, TX

Trades Involved: Plumber, Electrician, Forklift Operator, General Contractor

Scope: Single Site — Physical Rehabilitation Facility
The Challenge
An aquatic treadmill is among the most technically demanding pieces of rehabilitation equipment to install. The unit requires precise positioning, complex plumbing connections, and a dedicated electrical panel to operate. Installing it in an active clinical environment added an additional layer of care. The work needed to be completed without disrupting patient care or compromising the facility’s cleanliness standards. Coordinating a plumber, electrician, forklift operator, and general contractor under a single installation project required careful sequencing to keep each trade working efficiently without creating conflicts on site.
Our Approach
Pure Install coordinated the full multi-trade installation. A forklift was used to unload and position the aquatic treadmill unit within the facility, a necessary step given the equipment’s size and weight. With the unit in place, Pure Install’s plumber completed the complex plumbing connections while the electrician set up the full electrical panel required to power the system.
Each trade was sequenced to minimize time on site and keep the clinical environment as undisturbed as possible throughout. The installation was completed with all systems connected, configured, and ready for use at Impact Therapy Solutions.
Project Highlights
- Aquatic treadmill delivered and positioned using forklift in a clinical rehabilitation facility
- Complex plumbing connections completed as part of full installation scope
- Full electrical panel setup and configuration included
- Multi-trade crew — plumber, electrician, forklift operator, general contractor — coordinated under one point of contact
- Clinical environment maintained throughout with minimal disruption to facility operations
- All systems connected, configured, and operational at project completion
Outcome
A fully installed and operational aquatic treadmill at Impact Therapy Solutions: plumbing connected, electrical panel configured, and the unit ready for patient use.
Installing Specialty Equipment in a Healthcare or Clinical Environment?
Pure Install coordinates the trades — plumbing, electrical, rigging, and general contracting — so your equipment is installed correctly and your facility stays operational.













